SUPPORT
Check first.
Then RMA.
Most issues come from platform configuration or modules per channel. Check the serial number and deployment conditions first, then start an RMA.
Model, batch and warranty status.
WARRANTYWarranty policy3-year limited warranty, exclusions and RMA process.
SPECProducts & specsCapacity, organization, timings and BOM.
DEPLOYPre-deployment checksPlatform, modules per channel and airflow.
DOCUMENTSDocumentsDatasheets, test reports and compliance files.
CONTACTContact sales / supportQuotes, samples and after-sales.
PLATFORM
Platforms & specifications
Built for data centers and server OEMs. The table lists nominal specifications. Platform validation lists and test reports are provided per project.
| Model | Capacity | Organization | Data rate | Pins | Warranty |
|---|---|---|---|---|---|
| DDR5 64GB 5600 | 64 GB | 2R×4 | 5600 MT/s | 288-pin | 3-year limited |
Nominal values. Delivered specifications follow the model datasheet and test report.
DEPLOY
Four checks before deployment
- 01Confirm platform support
Check that the server platform and BIOS support the target DDR5 capacity.
- 02Confirm modules per channel
Review capacity and speed derating rules for 1DPC / 2DPC configurations.
- 03Confirm thermal conditions
Verify airflow and the BMC temperature alarm thresholds for the target environment.
- 04First-article power-on
For the first shipment, complete a full system power-on and stress test before rollout.
DOCUMENTS
Request documents
- Product datasheet (per model, PDF)Per projectContact sales
- Per-module test report samplePer projectContact sales
- Platform validation list (QVL)Per projectContact sales
- RoHS / REACH declarationsPer projectContact sales
These documents contain batch and customer information and are provided through sales or technical support.